Loading…
Loading…
20d ago
inI chose a 60 ton over a 90 ton for a tight job in Newark and it saved my whole week
Going smaller works until it doesn't, and rooftop HVAC swaps are exactly where guys get burned because the unit weight isn't the whole story once you add the curb, the rigging, and a radius that grows on you. A 60 ton leaves you almost no room if the real load comes in heavier than the submittal or the boom has to reach further than you planned, and then you're the guy calling for a bigger crane while the clock runs. The money you saved won't feel like much the day a pick sits on the edge of the chart.
23d ago
inPro tip: a nail tech at a salon in Boise showed me I was cutting cuticles way too aggressive
Eight years of thinking red nail beds were just part of the job, ouch. That tech basically saved you from yourself, and probably saved your clients too. So is the nipper retired for good or does it still come out for the stubborn ones?
24d ago
inOverheard a tool room guy say he checks his backlash before every setup, not just after a crash
Man, 90 seconds to save a $1,200 scrap run is a no brainer. Catching that 0.0015 drift on Y before it turned into taper on every bore probably paid for the indicator ten times over. Check it every setup, it's cheap insurance.