13
Spent 8 hours fixing a core box that should have taken 30 minutes
We had a simple 2-part core for a pump housing, but the prints called for a 0.005-inch draft on a curved surface that our pattern shop missed. I had to hand-scrape the entire core box cavity with a graver to get it right, which took my whole shift. Has anyone else had a print spec like that slip through and wreck your day?
2 comments
Log in to join the discussion
Log In2 Comments
emery6038d ago
Sounds like a rough day, but was that tiny draft even needed?
2
lunah868d ago
Gotta start somewhere with the big picture.
4