L
7

Overheard a guy at the supply house say he wires new homes with nothing but Wagos now

I was grabbing some 12/2 yesterday and this older sparky was telling the counter guy he's been doing full new construction jobs with nothing but Wago lever nuts for the last 2 years. No wire nuts at all, not even for pigtails. He said it saves him like 20 minutes per box and he's never had a callback. I've always used wire nuts on my own jobs but I'm starting to wonder if I'm just being stubborn. Anyone else made the full switch or stuck in the old ways too?
2 comments

Log in to join the discussion

Log In
2 Comments
jennifer_west
20 minutes per box? That math feels off. I'd have to see it to believe it.
3
kaimiller
kaimiller13d ago
Wait, did he count the time he spent untangling his own hair?
2