L
14

Vent: A client in Denver told me my shop drawings were 'too detailed' to build from

It was for a steel frame job about six months ago. He looked at the section views and connection details I spent two days on and said, 'This is just confusing the guys in the field.' He wanted me to basically just hand over the architect's plans with a stamp. I felt like all my work was pointless... Has anyone else had a client push back on the actual quality of your drafting?
3 comments

Log in to join the discussion

Log In
3 Comments
john648
john64818d ago
Ugh, that's the worst feeling!
3
terry_torres40
Tell me about it, @john648, my life story right there.
7
finleymiller
Classic, @terry_torres40. Good work gets punished now.
1