Vent: picked a fixed crane over a mobile rig for the precast panels on the Oak St job
We had a tight window at 4th and Oak last month and I had to choose between renting a tower crane for the 3 week precast panel install or just bringing in a 200 ton mobile. I went with the mobile since the site had no room to pour a base and the panels were all under 8 tons, and it honestly went smooth, 3 days ahead by the end. My super wanted the tower and I still hear about it. Anyone else had a call like this go better than expected?
That super second guessing you after the job came in 3 days ahead would drive me up a wall. Sounds like you read the site right though, no room for a base plus all the panels under 8 tons means the mobile was the smart play. I've been on jobs where the fancy crane sat idle half the day waiting on rigging, so speed matters more than the paper answer sometimes. Hang in there, the schedule talks louder than he does.