DAE lose half a day to a hump in the subfloor that only showed up after the pad went down?
Last Thursday I was finishing a 40 yard stretch job in a rental over on Maple Street and found a 3/4 inch hump right in the middle of the hallway that I missed during the walk through. I had to pull back about 15 feet of pad and carpet, grind the high spot down, and patch it, which turned a 6 hour day into almost 11. Does anyone else here check the floor with a straightedge before the pad goes down, or do you just trust your feet like I did?
I started dragging a 6 foot level down every hallway before the pad goes down, takes two minutes and saved me from that exact mess. Your mileage may vary depending on how bad the subfloor is, but it beats pulling carpet back twice.