Showerthought: are we wasting time putting connectors on before running the drop?
Every guy on my crew crimps the end before fishing the line, and I keep saying we should pull the whole run first and crimp after, since the connector keeps snagging on the same corner stud in these older Dallas houses. Did a 22 drop job last week and lost about 40 minutes redoing three ends I mashed pulling them through. Which way do you all do it?