My lead tech in Fresno said to label every zone at the panel before I test, and I figured it was a waste of 20 minutes | Alarm System Installers - Librear
My lead tech in Fresno said to label every zone at the panel before I test, and I figured it was a waste of 20 minutes
I've always just toned out zones as I go and written them down after, but he kept saying to label first at the can. Last Tuesday I did it his way on a 32 zone panel in a house off Van Ness, and I was done with the walk test in 40 minutes instead of my usual hour and a half. Turns out hunting for which wire was which with a toner in one hand and a clipboard in the other was the slow part all along. I still feel a little dumb about it. We've got two more panels to do this week on the same street, so we'll see if it holds up. Any of you label at the can or do you map it out somewhere else first?