Unpopular opinion: sub's punch list saved me from a $4k rework in Tucson
The super walked my framing at 7am and said "you're nailing to the line, not the plans" after I'd already hung 60 feet of wall on a retail build. I switched to laying out from the column lines with a chalk box before any plates went down, and we caught two out of square walls before drywall. Anyone else get a jab like that from a super that actually stuck with you?