Rant: I went with bagged mix over site mix on a 12 yard driveway pour in Tulsa and I'm still fixing it
The plant was 45 minutes out so I had them truck in bags and mix on site to save the delivery fee, but the slump came out different on every third batch and we chased it all morning. Two control joints popped hairline cracks by week three and the homeowner texted me photos of every single one. What's your cutoff for yardage where site mixing stops being worth the hassle?