My lead tech in Fresno said to label every zone at the panel before I test, and I figured it was a waste of 20 minutes | Computer Technicians - Librear
My lead tech in Fresno said to label every zone at the panel before I test, and I figured it was a waste of 20 minutes
I used to just trace wires hot with a toner and skip the masking tape, until a 3-story house on Cedar Ave ate up 90 minutes of my Tuesday chasing a mislabeled breaker. Once I started tagging each zone at the panel first, the same job took me 40 minutes flat and I didn't blow a single fuse. Does anyone else have a quick labeling trick that actually holds up on the messy panels?
Wait, are you testing zones hot while you label them? That part doesn't add up for me. If the panel is still live you can't safely pop covers and tape labels, and if you killed the main to tag things then the toner wouldn't work anyway on dead wires. The tagging step saves time, sure, but I'd bet the 40 minutes came from testing after you mapped the panel dead, then powering up. Also masking tape turns to goo on a hot panel within a year, so grab a cheap label maker or at least a sharpie on the inside of the cover. Curious how you're actually doing the order of it.