Went with double glue down on a basement in Reno and now I'm second guessing
Did a 600 sq ft basement job in Reno last month and the homeowner wanted it over old slab that had some moisture. I had to pick between double glue down or laying 6 mil plastic first, and I went with the double glue since the glue I use handles up to 5 lbs of vapor. It went down fine and grabbed quick, but two weeks later I got a callback about a bubble near the sump pump. Turned out the slab was reading higher than my meter showed that day. Curious if you guys would've gone plastic first or stuck with the glue.