Stopped at a truck stop outside Amarillo and watched a guy load 6 classics onto one open trailer
He had two guys strapping them down in 20 minutes flat and I'm still not sure if that was impressive or terrifying, so I'm curious how much time you all expect a shipper to spend on tie-downs before a long haul.