Why does nobody talk about checking your tube sheet before the hydro test?
Two jobs back I rushed the tube sheet on a 60 inch drum and didn't catch a rolled tube until the hydro was already running. Now I walk the sheet with a flashlight before the pump even gets hooked up, and sure enough last month in Baton Rouge it caught two bad ones. Does anyone have a good routine for this or do you all just wing it like I did for years?