Tracked every RFI for 6 months on the Riverside job and found I was the bottleneck
Sat down with the log and saw 60 percent sat waiting on me for at least 4 days before I sent them out. Now I do one batch at 7am and one at 3pm, anyone else had to fix their own review habit before blaming the subs?