Took me 11 days to figure out a 4 hour concrete pour problem
Had a slab pour scheduled for 6am on a Tuesday. Forms were set, rebar inspected, trucks lined up. Then the pump truck operator walks the line and says the grade is off by 3 inches on the north side. Turns out the laser level I borrowed from the site trailer had been dropped and was reading wrong the whole time we set forms. Spent 11 days ripping out and resetting forms, rechecking grade with a different level, and re-inspecting. A $60 level calibration would have saved me almost two weeks. How do you all handle tool calibration on site? Do you have a set schedule or is it every man for himself?