Watched an 8 inch pour turn into a 3 inch mess in 40 minutes because the guy kept adding water to the truck
We were placing a driveway in Bakersfield and this finisher kept hosing down the chute to make it flow easier, and by the time we got to screeding, the mix had lost its body and the edges slumped so bad we had to tear out 2 sections the next morning, so has anyone else had luck getting a driver to lock the water valve before the slump gets wrecked?