My old foreman in Akron told me to wet the brick before laying it in July heat, and he was dead right
I figured soaking brick was a waste of time until a stretch of wall started sucking the mortar dry before I could even strike the joint. Wetting them down for about 20 seconds a brick cut my mortar use and the joints came out smooth on the first pass. Anyone else got a hot weather trick they swore off and then came around to?